Sparkhill Leisure Centre

  • Client
    Elite Aluminium Systems Ltd
  • Architect
    Roberts Limbrick Architects
  • Site
    Birmingham

PROJECT DESIGN

Opened in June 2017, the £7.5 million Sparkhill Pool was part of a major redevelopment of Birmingham City Council leisure services.  The new build has replaced the crumbling 1930s pool which was closed in 2008 and uses equipment from the London 2012 Olympics pool. D4S provided professional consultancy services associated with the structural engineering of the 300wide glass façade fin steel support frame.

Images: BQLive